Concrete Barriers & Jersey Barriers UAE

Concrete Barriers & Jersey Barriers UAE

Precast Jersey, K-rail, F-type, and interlocking concrete road barriers for UAE diversions, work zones, highways, and site security.

Weight 1,600 / 2,400 kg
Height 810 mm
Length 1m / 2m / 3m
Strength 50 MPa
Precast Bunkers & Concrete Shelters UAE

Precast Bunkers & Concrete Shelters UAE

Factory-cast bunker shells, concrete shelters, C-channels, and U-channels for UAE shelter, utility, and protective construction works.

System Bunker Shell / C-Channel / T-Wall / U-Channel
Concrete C40/50 / UHPC on request
Dimensions Custom to project drawings
Wall / Slab Thickness 150mm to 250mm typical
Precast T-Walls & Blast Walls UAE

Precast T-Walls & Blast Walls UAE

Self-standing precast T-wall and blast wall barrier units for UAE protective perimeters, checkpoint hardening, and force-protection projects.

System T-Wall / Blast Wall
Height 3m / 3.6m / 6m typical
Concrete C40/50 / UHPC on request
Base Self-standing T-base
Precast Manholes & Utility Chambers UAE

Precast Manholes & Utility Chambers UAE

Custom precast manhole chambers for stormwater, sewerage, telecom, electrical, water, and UAE infrastructure networks.

System Manhole / Utility Chamber
Dimensions Custom to drawings
Concrete C35/45 to C40/50
Openings Pipe / duct / cable entries
Concrete Hoarding Blocks & Fence Bases

Concrete Hoarding Blocks & Fence Bases

Concrete hoarding blocks and fence bases for temporary site perimeters, boundary protection, and wind-load stability.

Market Name Fence Footing Block
Standard Weight 600kg / 1000kg
Dimensions 1000x500x500mm
Hole Size Dia 48mm / 60mm
UV-Resistant Reinforced Fence Bases

UV-Resistant Reinforced Fence Bases

Industrial-grade reinforced feet for permanent and temporary mesh fencing.

Common Name Mesh Fence Footing
Hole Options Round / Square Post
Weight 25kg - 35kg
Durability Concrete (Not Plastic)
High-Strength Concrete Masonry Blocks

High-Strength Concrete Masonry Blocks

Load-bearing solid and hollow blocks for structural wall construction.

Standard Size 400x200x200 mm
Types Hollow / Solid
Strength 7.5N / 15N / 20N
Density Normal / Lightweight
Precast RCC Box Culverts UAE

Precast RCC Box Culverts UAE

RCC precast box culverts for UAE stormwater drainage, road crossings, service ducts, and utility tunnels — single, twin, and multi-cell, cast to drawings.

System RCC Box Culvert / Drainage Channel
Cells Single / Twin / Multi-cell
Span Custom to drawings
Wall Thickness 150mm to 300mm
Concrete Wheel Stoppers UAE

Concrete Wheel Stoppers UAE

Precast concrete wheel stoppers and parking car stops for bay demarcation, impact control, and UAE car parks.

Common Name Car Stop / Curb
Standard Lengths 1.8m / 2.0m
Height 100mm / 120mm
Fixing 2x Rebar Spike / Bolt
Reinforced HVAC Equipment Pads

Reinforced HVAC Equipment Pads

Dampening foundations designed for rooftop and ground MEP installations.

Market Name AC Base / Plinth
Size Options 600x600 / 900x900
Thickness 50mm / 75mm
Feature Vibration Damped
RTA-Type Light Pole Foundations

RTA-Type Light Pole Foundations

Type 1 & 2 foundations with pre-installed anchor cages and earthing points.

Type Precast Concrete Base
Pole Height For 6m - 12m Poles
Standard RTA Type 1 / Type 2
Fixing 4-Bolt Cage (M24/M30)
DEWA-Standard Cable Route Markers

DEWA-Standard Cable Route Markers

132kV/400kV corridor identifiers with bilingual recessed text.

Known As Cable / Duct Marker
Types Flush / Surface Post
Plate Size 100x75mm Recess
Post Height 760mm Standard
DCL-Certified Hydraulic Paving Slabs

DCL-Certified Hydraulic Paving Slabs

35MPa high-density slabs for walkable roofs and public walkways.

Market Name Hydraulic Pavers
Standard Size 600x600 / 400x400
Thickness 50mm / 40mm
Strength >35 MPa
RTA-Approved Water-Filled Barriers

RTA-Approved Water-Filled Barriers

UV-stabilized HDPE barriers for agile traffic diversion and crowd control.

Type Interlocking Road Separator
Dimensions 2000L x 800H x 400W
Weight (Empty) 18kg - 22kg
Weight (Full) Up to 500kg
High-Intensity PVC Traffic Cones

High-Intensity PVC Traffic Cones

Class 2 reflective cones with heavy-duty weighted bases for stability.

Height Options 750mm / 1000mm
Material Flexible PVC (Black Base)
Weight 4.5kg / 5.5kg (Weighted)
Reflective Class 2 Prismatic
Infrastructure Relocation Services

Infrastructure Relocation Services

Crane-assisted relocation for Jersey barriers and site fencing assets.

Service Crane Logistics
Benefit Asset Utilization
Coverage All Emirates
Handling Lift & Place
Strategic Bulk Logistics

Strategic Bulk Logistics

40ft flatbed trailer convoys for emirate-wide infrastructure supply.

Vehicle 40ft Flatbed
Capacity High Volume
Mode Convoy Fleet
Coverage Inter-Emirate
Consolidated Site-Pack Delivery

Consolidated Site-Pack Delivery

Mixed-load delivery optimizing transport for small to mid-scale sites.

Benefit Cost Efficiency
Load Mixed Assets
Ideal For Small Sites
Saves Multi-Trip Fees

Project Support

Supply Planning for Active Packages

Use the catalogue to shortlist products first. When you are ready, send the package details and we will confirm availability, casting scope, logistics, and documentation.

Main product focus

Our priority products are concrete barriers and Jersey barriers, precast bunkers and concrete shelters, T-walls and blast walls, and precast manholes with utility chambers. These are the products we treat as the core of project supply and SEO content.

Supporting fillers

Wheel stoppers, masonry blocks, paving slabs, AC slabs, cable markers, light footings, plastic barriers, fence bases, hoarding blocks, and logistics services support combined packages but are not the main positioning.

What to send for pricing

Send your BOQ, drawings, quantities, delivery location, target dates, and any consultant, RTA, DM, or ADM requirements so the quotation is clear from the start.

How we support delivery

We coordinate factory casting, stock review, transport planning, and QA documents for phased call-offs, urgent replacements, and scheduled site delivery.

Quick Answers

Frequently Asked Questions

Do you supply barriers, bunkers, and shelters from the same factory?

Yes. PRECAST UAE manufactures concrete barriers, Jersey barriers, precast bunkers, concrete shelters, blocks, and supporting site products from the same operation so project teams can coordinate supply with one vendor.

Can you cast custom sizes for active projects?

Yes. We review drawings, dimensions, lifting requirements, and quantity schedules, then confirm whether the product can run on existing moulds or needs custom casting.

What should we send for a quotation?

Send your BOQ, drawing set, quantity split, delivery location, required dates, and any authority or consultant specs. That lets us quote production, logistics, and documentation correctly.

Do you quote delivery, offloading, and project logistics?

Yes. Where the package requires it, we can quote supply together with delivery planning, offloading requirements, crane coordination assumptions, and phased call-off support.

Do you support RTA, Dubai Municipality, or Abu Dhabi Municipality requirements?

Yes. If the package references RTA, DM, or ADM requirements, share the specification or approved drawing set with the enquiry so we can align the quotation, production scope, and documentation.

Which products are requested most for UAE infrastructure and site packages?

The highest-priority enquiries are concrete barriers and Jersey barriers, precast bunkers and concrete shelters, T-walls and blast walls, and precast manholes or utility chambers. Other catalogue products are available as supporting items for combined site packages.

Abu Dhabi Office

MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614

Hours: Mon–Fri 8:00 AM – 5:30 PM

Sharjah Factory

Sharjah Industrial Area, Sharjah

Hours: Mon–Sat 7:00 AM – 6:00 PM

24h Quote
Fast Response
UAE Delivery
Nationwide
Factory Direct
Best Value

Talk to our team

We're here to help with your project

Sales Support: +971 54-171-3700 General Inquiries:

Request a Project Quote

Share your requirements and we'll get back to you within 24 hours.

1 Contact
2 Project
3 Details
Your information is secure and will not be shared.
Success! Your inquiry has been received. Our team will contact you shortly.
Error! Please check your connection and try again.
Call WhatsApp Email