Water-Filled Plastic Traffic Barrier
UV-stabilized HDPE barriers for agile traffic diversion and crowd control.
Indicative price AED 200 – 340 Subject to specification and quantity. Final quote on request.
Product Description
Water-Filled HDPE Traffic Barrier
Product Overview
The Water-Filled HDPE Traffic Barrier is the primary solution for temporary traffic management and short-term site delineation in the UAE. Engineered from high-impact, UV-stabilized High-Density Polyethylene (HDPE), these barriers provide a highly visible, physically imposing deterrent to vehicle encroachment.
When filled with water or sand, they form a solid, continuous wall suitable for low-speed diversions and pedestrian protection. Their lightweight empty state ensures rapid manual deployment without the need for heavy lifting equipment.
Material Specifications & Quality
- Material: Virgin HDPE with UV inhibitors (UV8 rating or higher).
- Wall Thickness: Uniform thickness ensuring resistance to puncture and cracking.
- Colors: UV-resistant Red and White pigments for standard alternating deployment.
Key Technical Advantages
- RTA Compliance: Meets local specifications for temporary road safety furniture.
- Impact Absorption: Fluid-filled core absorbs kinetic energy during minor impacts, reducing damage to both the barrier and the vehicle.
- Interlocking Design: Integrated pin or tongue-and-groove system allows barriers to pivot, enabling the creation of smooth curves and tight corners.
- Logistical Efficiency: Stackable design maximizes transport volume; lightweight manual handling reduces labor costs.
Technical Data
| Specification | Value |
|---|---|
| Material | UV-Stabilized HDPE |
| Length | 2000 mm (Standard) |
| Height | 800 mm |
| Width (Base) | 400 mm - 500 mm |
| Weight (Empty) | ~18 kg |
| Weight (Filled) | > 200 kg (Water) |
| Connection | Interlocking Pin / Coupler |
Applications in the UAE
- Road Diversions: Channelizing traffic through temporary layouts during road widening or maintenance.
- Construction Frontage: Safe separation of work zones from public footpaths.
- Event Management: Crowd control lines and queue management for major events.
- Carparks: Temporary closure of parking levels or bays.
Why Choose PreCastUAE?
- Regional Durability: Our plastic specification is tested to withstand the UAE summer heat without becoming brittle or fading to pink/pale shades.
- Leak-Free Guarantee: Rotational moulding process ensures a seamless, single-piece construction.
- Accessories: Available with optional fencing panels (mesh toppers) to increase security height to 2 meters.
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.