Precast Concrete Hoarding Block
Concrete hoarding blocks and fence bases for temporary site perimeters, boundary protection, and wind-load stability.
Indicative price AED 165 – 280 Subject to specification and quantity. Final quote on request.
Product Description
Concrete Hoarding Blocks & Fence Blocks UAE
Product Overview
Our concrete hoarding blocks and fence concrete blocks are structural ballast units designed to provide overturning resistance for temporary perimeter fencing, solid hoarding systems, and site boundary protection. In the UAE’s high-wind environment, reliance on sandbags or non-engineered weights poses significant liability risks. Our blocks are engineered to meet Dubai Municipality (DM) requirements for site hoarding stability, ensuring public safety and structural integrity. Compliant with DM Local Order 44 (1990) and Circular 208 for temporary fencing.
These units are compatible with standard galvanized scaffolding tubes and proprietary fencing panels, serving as the foundational anchor for construction site perimeters. Contractors looking for a hoarding block supplier, concrete block for fencing, or temporary support for a precast fence wall can use these blocks as part of the site perimeter package.
Material Specifications & Quality
- Concrete Grade: C30/37 Mass Concrete.
- Durability: Resistant to sulphate attack and physical abrasion.
- Design Life: 10+ years of repeated site usage.
- Testing: Periodic cube testing to ensure compressive strength compliance.
Key Technical Advantages
- Wind Load Stability: High mass-to-volume ratio ensures fencing remains vertical during gusts exceeding 80 km/h (dependent on panel solidity and spacing). Calculated for open terrain exposure.
- Universal Compatibility: Pre-formed recesses and grooves accept standard Ø48mm scaffold tubes and fencing couplers.
- HSE Compliance: Replaces unsafe, degrading sandbags with a solid, verifiable weight, reducing trip hazards and site debris.
- Rapid Handling: Integrated forklift pockets or lifting hooks facilitate quick deployment and re-sequencing by site telehandlers.
Technical Data
| Specification | Standard Block | Large Block |
|---|---|---|
| Weight | ~600 kg | ~1000 kg |
| Concrete Grade | C30 | C30/40 |
| Lifting | Forklift Pockets / Eye | Forklift Pockets / Eye |
| Pole Compatibility | Standard Scaffolding | Standard Scaffolding |
| Finish | Fair-faced / Off-shutter | Fair-faced / Off-shutter |
Applications in the UAE
- Construction Hoarding: Anchoring solid metal or plywood hoarding panels around active construction zones.
- Event Fencing: Stabilizing mesh fencing for crowd control at concerts and sporting events.
- Temporary Signage: Ballast for project signboards and advertising structures.
- Structural Guying: Deadweight anchors for tent structures and marquees where ground penetration is prohibited.
Market Context: Regulatory & Demand Drivers
Hoarding compliance is critical in 2026. Recent regulations and market activity highlight the need for engineered stability:
- UAE Safety Rules 2026: New regulations define engineering controls (like secure perimeter hoarding) as a primary safety requirement, superior to simple PPE.
- Record Property Launches: With 177,624 units launched in 2025, every new plot requires immediate perimeter security before excavation begins.
- Internal Roads Projects: Distributed infrastructure work requires flexible, temporary fencing solutions that can be rapidly relocated.
Why Choose PreCastUAE?
- Immediate Availability: We maintain substantial stock buffers to respond to urgent site mobilization requirements.
- Logistical Support: Fleet delivery with offloading capabilities directly to the fence line.
- Buy-Back Option: We offer buy-back schemes for large quantities, improving project cash flow and sustainability.
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.