PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات
PRECAST UAE | بريكاست الإمارات

Product
Catalog

2026 EDITION
Infrastructure Traffic Safety Custom Casting
Trusted By RTA • DEWA • Dubai Municipality
PRECAST UAE |
Credentials & QA/QC

Authorized Accreditations

RTA (Roads & Transport Authority) approved supplier badge
RTA Approved
Roads & Transport Authority
Dubai & Abu Dhabi Municipality compliance badge
Municipality Compliant
Dubai & Abu Dhabi Specs
ISO 9001:2015 Quality Management certification badge
ISO 9001:2015
Quality Management System
ISO 14001 Certified
ISO 14001:2015
Environmental Management
ICV Certified
ICV Certified
In-Country Value Program
Made in UAE
Made in UAE
Industrial Development
HSE Certified
ISO 45001:2018
Health & Safety Management

Standard QA/QC Package

Papers get you paid. In the UAE's strict regulatory environment, we deliver the complete QA/QC documentation package with every shipment to ensure immediate site approvals.

1. Steel Mill Certificate
Verifies that the reinforcement steel originates from certified mills (e.g. Emirates Steel) and meets specified tensile and yield strength benchmarks.
2. Compressive Strength Report
Independent 7-day and 28-day concrete cube crush test reports from accredited laboratories confirming concrete strength properties (up to C40/50).
3. Factory Method Statement
Comprehensive engineering outlines detailing casting, steam/water curing, handling, and logistics protocols under ISO 9001 audit standards.
PRECAST UAE |
Custom Casting Solutions
📐

Custom Casting Specialists

Did you know? 90% of our active production is engineered to match tailored project requirements.

Why Choose Custom Casting?

  • Specific dimensions engineered for site constraints
  • Specialized reinforcement layout for extreme structural loads
  • Bespoke architectural finishes, textures, or colors
  • Integrated MEP channels, sleeves, and certified lifting anchors

Our Production Process

  1. Technical Consultation: Review and optimization of client drawings or BIM models.
  2. Mold Fabrication: In-house custom steel mold engineering and fabrication.
  3. Casting & Curing: Controlled factory pour, hydration, and curing protocols.
  4. Logistics & Delivery: Direct-to-site logistical planning with crane-assisted offloading.

Have a Custom Precast Requirement?

Reach out for custom mold fabrication and delivery scheduling. Use the checklist on Page 11.

Technical Queries:
PRECAST UAE |
Completed Infrastructure Projects
Sixteen precast concrete bunker units supplied for Dubai Petroleum
Dubai Petroleum Bunker Supply
Dubai
Manufactured and supplied 16 precast bunker units for Dubai Petroleum, supporting a project package that required coordinated dispatch, durable concrete finish, and crane-ready lifting points.
Oil & Gas Precast Bunkers Dubai
Concrete Jersey Barriers installed at Dubai South Airport Road
Al Maktoum Airport Road
Dubai South
Supply and installation of 15km of K-Type Jersey Barriers for the main airport access road. The project required 24/7 delivery logistics to meet the fast-track paving schedule.
Infrastructure Road Barriers RTA
Masonry block boundary walls for residential villas
Damac Hills Community
Damac Hills
Bulk supply of high-density 200mm hollow blocks for boundary walls and substructures of 150 luxury villas. Delivered on crane-mounted trucks for direct plot offloading.
Residential Masonry Blocks Construction
Road barrier replacement and maintenance on E311
Sheikh Mohammed Bin Zayed Rd
E311 Highway
Urgent maintenance contract involving the removal of damaged barriers and installation of new precast elements during night shifts to minimize traffic disruption.
Maintenance Infrastructure Emergency
PRECAST UAE |
Road & Security Barriers

Concrete Barriers & Jersey Barriers UAE

Ref: JERSEY-BARRIER
Red-and-white precast concrete Jersey barrier for UAE roadworks

Precast concrete barriers, Jersey barriers, K-rail barriers, and interlocking road barriers supplied for UAE roadworks, traffic diversions, construction sites, and security perimeters. RTA and municipality requirements remain a compliance signal, but the buying category is broader than one Jersey barrier variant.

Project teams use these units when they need dependable stock, clear dimensions, new or refurbished condition options, and delivery planning across Dubai, Abu Dhabi, and other live infrastructure packages.

Base Width 600mm
Weight 2400kg
Reflectivity Class 2 Prismatic
Concrete Strength 50 MPa (C40/50)
Standards:
RTA G-01 / EN 1317 Certification MASH-1 Crash Tested / ASTM C825

Precast T-Walls & Blast Walls UAE

Ref: T-WALL
map[ar:حاجز جدار T مسبق الصب en:Precast T-Wall Barrier]

Precast T-Walls and Blast Wall Barriers for protective perimeters, checkpoint hardening, and force-protection layouts. These are priority products for security and infrastructure packages where standard road barriers do not provide enough height or coverage.

Units are produced to project drawings with engineered reinforcement, lifting details, and QA documentation.

System T-Wall / Blast Wall
Height 3m / 3.6m / 6m
Concrete C40/50 / UHPC on request
Handling Crane-ready lifting anchors
Standards:
BS EN 1992 / ACI 318 Shop drawings + QA/QC package
PRECAST UAE |
Bunkers & Culverts

Precast Bunkers & Concrete Shelters UAE

Ref: PRECAST-BUNKER
Precast concrete bunker shell unit at the UAE factory

Precast bunker, shelter, and box culvert components manufactured for underground protective structures, drainage and utility crossings, secured rooms, and project-led security packages. We supply bunker shells, RCC box culverts, plus C-Channel, T-Wall, and U-Channel precast units — the rectangular enclosure geometry is the same, the reinforcement and wall thickness change with end use.

As a precast manufacturer, our role is to cast, document, and deliver the structural units clients use to assemble underground shelter, bunker, and culvert systems on active sites across the UAE.

System Bunker / C-Channel / T-Wall / U-Channel
Slab Thickness 250mm
Reinforcement Double Mesh 12mm Ø
T-Wall Heights 3m / 3.6m / 6m
Standards:
BS EN 1992-1-1 / ACI 318 ISO 9001 / ASTM C478

Precast RCC Box Culverts UAE

Ref: BOX-CULVERT
map[ar:وحدة عبّارة صندوقية خرسانية مسلحة مسبقة الصب en:Precast RCC box culvert unit]

Precast RCC box culverts manufactured for UAE stormwater drainage, road and rail crossings, irrigation channels, service tunnels, and utility duct banks. Supplied as single-cell, twin-cell, and multi-cell units cast to project drawings, with wall thickness and reinforcement set by the hydraulic and load requirement.

Precast box culverts replace slow in-situ casting: units are cast and cured in the factory, delivered in sequence, and set on prepared bedding so the trench can be backfilled and reopened to traffic quickly.

System RCC Box Culvert / Drainage Channel
Cells Single / Twin / Multi-cell
Span Custom to drawings
Concrete C40/50 RCC
Standards:
BS 5911-6 / ASTM C1577 Shop drawings + QA/QC package
PRECAST UAE |
Utility Chambers & Foundations

Precast Manholes & Utility Chambers UAE

Ref: PRECAST-MANHOLE
Precast concrete utility chamber (manhole) unit, UAE

Precast Manholes and Utility Chambers for drainage, telecom, electrical, water, and infrastructure networks. These are priority project products, produced to drawings with openings, cover loading, lifting details, and QA documentation.

Typical use cases include inspection chambers, telecom chambers, electrical chambers, valve chambers, and custom RCC access structures.

System Manhole / Utility Chamber
Dimensions Custom to drawings
Concrete C35/45 to C40/50
Openings Pipe / duct / cable entries
Standards:
DM / ADM / DEWA / BS EN 1917 Shop drawings + QA/QC package

RTA-Type Light Pole Foundations

Ref: LIGHT-FOOTING
Precast RTA-type light pole foundation with anchor cage, UAE

Our RTA-Type Light Pole Foundations are the preferred choice for rapid infrastructure mobilization in residential and commercial developments. Engineered specifically for RTA Type 1 & Type 2 conical poles, these foundations feature pre-installed, high-tensile anchor bolt cages and dedicated earthing channels for immediate electrical integration.

By using our pre-cast units, contractors can achieve zero-tolerance vertical alignment, which is critical for the visual symmetry and structural stability of high-mast community lighting. The factory-cured concrete ensures maximum durability against soil-borne sulfates, outperforming on-site cast foundations.

Our Take: Eliminating on-site shuttering and curing cycles allows for immediate pole installation, accelerating project handover timelines for master-planned communities.

RTA Type Type 1 / Type 2
Anchor Cage Pre-Installed
Earthing Built-in Channel
Install Speed Immediate Load
Standards:
RTA Standard Drawing (Poles) BS EN 40-3-1 / ISO 9001
PRECAST UAE |
Paving Slabs, Blocks & Route Markers

High-Strength Concrete Masonry Blocks

Ref: MASONRY-BLOCK
Stacked concrete masonry blocks on pallets at the UAE factory

Certified Masonry Blocks manufactured to BS 6073 / ASTM C129 standards. Available in solid and hollow configurations for load-bearing and partition walls.

Our automated production line ensures consistent dimensional accuracy and compressive strength (7.5MPa to 15MPa). Fully cured and ready for direct site application.

Our Take: The foundational element for durable residential and commercial construction in the UAE.

Strength 7.5 - 15 N/mm²
Type Solid / Hollow
Dimensions 400x200x200mm
Density Normal / Lightweight
Standards:
DMS 1 Part 1 / BS 6073 Dubai Municipality Approved

DCL-Certified Hydraulic Paving Slabs

Ref: PAVING-SLAB
Stack of hydraulic precast concrete paving slabs, Dubai

DCL-Certified Hydraulic Paving Slabs for urban walkways and roof protection. Manufactured to DMS 1: Part 4 standards with a focus on high density and durability.

Verified by Dubai Central Laboratory (DCL), these slabs feature low water absorption (<5%) and high compressive strength (min 35MPa). Suitable for harsh coastal environments and high-traffic public zones.

Our Take: Superior durability and absorption characteristics compared to standard precast slabs.

Core Strength 35 MPa (Min)
Water Absorption Below 5%
Asbestos 100% Free
Standards:
DMS 1 Part 4: 2020 DCL-DMS-1 Verified

DEWA-Standard Cable Route Markers

Ref: CABLE-MARKER
DEWA-standard precast concrete cable route markers, UAE

DEWA-Standard Cable Route Markers for 132kV and 400kV transmission corridors. Precision-cast units designed for identifying underground utility services and preventing accidental damage.

Features recessed bilingual text (English/Arabic) and sun-resistant reflective paint for visibility in all terrains. Manufactured using Sulphate Resisting Cement for durability against ground chemicals.

Our Take: Essential for permanent utility identification and safety during future site excavations.

Placement 10m-50m Intervals
Text Style Bilingual Recessed
Visibility Sun-Resistant White
Material Sulphate Resisting Conc.
Standards:
DEWA TR-202 Corridor Standard Dubai Infrastructure Standard V2
PRECAST UAE |
Parking, Bases & Site Accessories

Concrete Wheel Stoppers UAE

Ref: WHEEL-STOPPER
Precast concrete wheel stopper installed in a UAE car park bay
Precast concrete wheel stoppers and parking car stops for bay demarcation, impact control, and UAE car parks.
Height: 120mm (Max)
Width: 200mm (Min)

Reinforced HVAC Equipment Pads

Ref: AC-SLAB
Reinforced precast concrete HVAC equipment pad (AC slab), UAE
Dampening foundations designed for rooftop and ground MEP installations.
Vibration Control: Integrated Dampening
Exposure Class: F1 (Moisture/Sand)

UV-Resistant Reinforced Fence Bases

Ref: FENCE-BASE
Reinforced precast concrete fence base feet for mesh fencing, UAE
Industrial-grade reinforced feet for permanent and temporary mesh fencing.
Density: 2400 kg/m³
UV Resistance: 100% (Natural)

Concrete Hoarding Blocks & Fence Bases

Ref: HOARDING-BLOCK
Precast concrete hoarding block for temporary site fencing in Dubai
Concrete hoarding blocks and fence bases for temporary site perimeters, boundary protection, and wind-load stability.
Stability: High Wind Load
Handling: Molded Lifting Lugs

RTA-Approved Water-Filled Barriers

Ref: PLASTIC-BARRIER
RTA-approved water-filled plastic traffic barriers, UAE
UV-stabilized HDPE barriers for agile traffic diversion and crowd control.
Material: UV-Stabilized HDPE
Ballast: Water / Sand Fill

High-Intensity PVC Traffic Cones

Ref: TRAFFIC-CONE
High-intensity reflective PVC traffic cones, UAE
Class 2 reflective cones with heavy-duty weighted bases for stability.
Sleeve: Prismatic Class 2
Base: Weighted Recycled Rubber
PRECAST UAE |
Value-Added Logistics & Services
Crane-equipped truck relocating precast barriers on a UAE site

Infrastructure Relocation Services

Infrastructure Relocation Services for site assets including barriers and fencing. We provide crane-equipped transportation and experienced teams to relocate precast elements as project requirements change.

Ensures safe handling and compliant transport of heavy assets. Our relocation service helps maintain the integrity of your precast elements throughout multiple site mobilizations.

Our Take: A practical service for contractors looking to maximize asset reuse across different project phases.

Fleet Crane-Equipped HLVs
Personnel Certified Riggers
Support Inter-Site Mobilization
40ft flatbed trailer convoy delivering precast units across the UAE

Strategic Bulk Logistics

Strategic Bulk Logistics for high-volume infrastructure supply. We utilize 40ft flatbed trailer convoys to provide a reliable supply chain for large-scale projects across the UAE and GCC.

All operations are monitored and adhere to safety standards, ensuring efficient delivery of heavy precast elements. Our fleet capacity supports project-scale requirements with consistent scheduling.

Our Take: Focused on providing the logistical support needed for large-scale construction timelines.

Transport 40ft Flatbed Convoys
Capacity Project-Scale Bulk
Reach GCC & Intra-Emirate
Mixed precast concrete load on a flatbed truck for site delivery

Consolidated Site-Pack Delivery

Consolidated Site-Pack Delivery for small to mid-scale project requirements. We combine different precast assets into a single delivery, reducing transport costs and site mobilization footprints.

An efficient solution for contractors to secure site perimeter and parking assets in a single mobilization. Reduces the complexity and overhead associated with multiple small-batch deliveries.

Our Take: A practical logistical choice for smaller urban or residential projects.

Efficiency Single-Run Load
Carbon savings Consolidated Transit
Cost Saving Reduced HVT Fees
PRECAST UAE |
Request for Proposal (RFP)

Please fill in this interactive template and email it to or attach it directly to your Whatsapp inquiry.

Sales Direct Line +971 54-171-3700
|
WhatsApp Support +971 50-383-0123
PRECAST UAE

Get an Instant Quote

Scan the QR codes or use the buttons below to connect with our engineering sales team.

WhatsApp Sales
WhatsApp Sales QR
Online Estimator
Quote Builder QR
precastuae.ae |
© 2026 PRECAST UAE. All Rights Reserved. Commercial reproduction without authorization is prohibited.