Reinforced Concrete Fence Base
Industrial-grade reinforced feet for permanent and temporary mesh fencing.
Indicative price AED 32 – 55 Subject to specification and quantity. Final quote on request.
Product Description
Reinforced Concrete Fence Footing
Product Overview
The Reinforced Concrete Fence Footing is the industry-standard support base for temporary “heras-style” mesh fencing panels. Unlike PVC or composite bases that degrade, crack, and leak filler material under the intense UAE sun, our concrete footings provide a permanent, maintenance-free solution.
Designed for harsh construction environments, these bases provide the necessary deadweight to keep fence lines upright and secure without the need for water or sand filling.
Material Specifications & Quality
- Matrix: C35/45 structural concrete.
- Reinforcement: Steel fiber reinforcement or 6mm rebar cage to prevent fracture during rough handling.
- Curing: Water-cured to maximize surface hardness and minimize dusting.
Key Technical Advantages
- Indestructible Durability: Impervious to UV radiation, extreme heat, and site impact. Will not split or leak.
- Zero Maintenance: Delivered ready-to-use. No on-site filling labor required.
- Optimized Geometry: Low center of gravity prevents tipping; compact footprint reduces trip hazards for pedestrians.
- Standard Interface: Precision-cast Ø40mm holes accept all standard temporary fencing frame tubes.
Technical Data
| Specification | Value |
|---|---|
| Material | Reinforced Concrete |
| Weight | 28 kg - 35 kg |
| Dimensions (LxWxH) | Approx. 600mm x 220mm x 150mm |
| Apertures | 2x or 3x Ø40mm holes |
| Lifespan | Indefinite (reusable across multiple projects) |
Applications in the UAE
- Site Demarcation: Securing perimeters for residential and commercial construction plots.
- Pedestrian Walkways: Creating safe, designated corridors within active worksites.
- Excavation Safety: Immediate barrier deployment around open pits and trenches.
- Roadworks: Temporary delineation for utility maintenance crews.
Why Choose PreCastUAE?
- Volume Capacity: Capable of supplying 1,000+ units per order for major infrastructure developments.
- Quality Control: Strict vibration protocols during casting ensure dense, void-free concrete that resists chipping.
- Cost-Efficiency: Although initially heavier to transport than empty plastic bases, the indefinite lifespan and zero-failure rate offer superior lifecycle value.
Technical Configurations
| Code | Type | Dimensions (LxHxW) | Weight (approx) | Hole Size | Concrete Strength | Reinforcement | Common Applications |
|---|---|---|---|---|---|---|---|
| FFB-600 | Fence Footing Block (Standard) | 1000x500x500mm | 600kg | Dia 48mm / 60mm | 40 MPa | Fiber / Rebar | Construction Hoarding |
| FFB-1000 | Fence Footing Block (Heavy) | 1000x500x500mm | 1000kg | Dia 48mm / 60mm | 40 MPa | Fiber / Rebar | High-Wind Areas |
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.