Utility

Hydraulic Pressed Paving Slabs

35MPa high-density slabs for walkable roofs and public walkways.

Indicative price AED 20 – 38 Subject to specification and quantity. Final quote on request.

Market Name Hydraulic Pavers
Standard Size 600x600 / 400x400
Thickness 50mm / 40mm
Strength >35 MPa

Product Description

Hydraulic Pressed Concrete Paving Slab

Product Overview

Hydraulic Pressed Paving Slabs are the technical standard for durable, modular surfacing in the UAE. Unlike wet-cast pavers, these units are manufactured under immense hydraulic pressure (minimum 400 tons), resulting in a product with exceptional density, high compressive strength, and low water absorption.

These slabs are the preferred choice for protecting waterproofing membranes on flat roofs, creating service walkways, and surfacing utility areas where functionality and longevity are paramount.

Material Specifications & Quality

  • Manufacturing Standard: BS EN 1339: Concrete Paving Flags. Compliant with Dubai Municipality Standard DMS 001 Part 4: 2020.
  • Process: Hydraulic Pressing (removing air voids and excess water).
  • Concrete: High-cement content mix with minimal water-cement ratio.
  • Finish: Standard pimple/textured finish for non-slip performance (SRV > 45).

Key Technical Advantages

  • Mechanical Strength: High bending strength prevents breakage under point loads from maintenance equipment or foot traffic.
  • Thermal Shielding: When installed on pedestals or insulation (inverted roof), they protect waterproofing layers from direct solar radiation and thermal shock.
  • Low Porosity: Dense structure resists water ingress, mitigating freeze-thaw damage (rare but relevant) and chloride attack.
  • Dimensional Precision: Steel moulds ensure uniform thickness and square edges for tight, trip-free laying patterns.

Technical Data

Specification Value
Dimensions 400x400mm / 500x500mm
Thickness 40mm / 50mm
Transverse Strength > 4.5 MPa
Compressive Strength >35 MPa
Water Absorption <5%
Colors Natural Grey / Red / Pigmented
Texture Pimple / Checker / Plain

Applications in the UAE

  • Roofing Systems: Walkway pads for AC maintenance access on bituminous or PVC roofs.
  • Inverted Roofs: Ballast layer over rigid insulation boards.
  • Utility Compounds: Durable flooring for sub-stations, pump rooms, and service yards.
  • Public Realm: Cost-effective paving for municipal footpaths and industrial zones.

Why Choose PreCastUAE?

  • Stock Consistency: We maintain large inventories of standard grey slabs to support immediate roofing close-outs.
  • Strength Verification: Regularly tested to ensure compliance with breaking load requirements.
  • Versatility: Compatible with various pedestal systems for raised flooring applications.

Abu Dhabi Office

MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614

Hours: Mon–Fri 8:00 AM – 5:30 PM

Sharjah Factory

Sharjah Industrial Area, Sharjah

Hours: Mon–Sat 7:00 AM – 6:00 PM

24h Quote
Fast Response
UAE Delivery
Nationwide
Factory Direct
Best Value

Talk to our team

We're here to help with your project

Sales Support: +971 54-171-3700 General Inquiries:

Request a Project Quote

Share your requirements and we'll get back to you within 24 hours.

1 Contact
2 Project
3 Details
Your information is secure and will not be shared.
Success! Your inquiry has been received. Our team will contact you shortly.
Error! Please check your connection and try again.
Call WhatsApp Email