Precast Concrete Wheel Stopper
Precast concrete wheel stoppers and parking car stops for bay demarcation, impact control, and UAE car parks.
Indicative price AED 50 – 95 Subject to specification and quantity. Final quote on request.
Product Description
Concrete Wheel Stopper Supplier UAE
Product Overview
The precast concrete wheel stopper is a critical safety element for parking facility management, designed to physically limit vehicle travel within designated bays. Buyers also specify these units as concrete parking stoppers, parking wheel stoppers, precast wheel stoppers, or car stopper concrete depending on the BOQ wording. By preventing vehicles from overhanging sidewalks or striking structural columns, walls, and other vehicles, these units mitigate property damage and liability.
Our wheel stops are engineered to withstand the impact of passenger vehicles and light trucks, offering a far superior lifespan compared to rubber or plastic alternatives which warp and detach in high temperatures.
Material Specifications & Quality
- Concrete Mix: C40/50 High-Performance Concrete.
- Reinforcement: 2x T10 longitudinal bars with stirrups for impact shear resistance.
- Finish Options:
- Standard: Fair-faced grey concrete.
- Painted: Industrial-grade chlorinated rubber paint (Yellow/Black) for high visibility.
Key Technical Advantages
- Standardized Dimensions: Sized to fit standard 2.5m x 5.0m parking bays without impeding pedestrian access between vehicles.
- Optimized Profile: Standard Height: 100mm - 120mm to clear low-profile sports car bumpers while stopping standard sedans/SUVs.
- Tire Protection: Chamfered top edges eliminate pinch points, preventing damage to low-profile tires.
- Secure Anchorage: Cast-in holes (Ø20mm) allow for robust fixing to asphalt (via rebar spikes) or concrete slabs (via expansion bolts).
- Thermal Stability: Concrete matches the thermal expansion coefficient of the parking surface, preventing loosening of fixings common with rubber stoppers.
Technical Data
| Specification | Value |
|---|---|
| Length | 1800 mm / 2000 mm |
| Height | 100 mm - 120 mm |
| Base Width | 150 mm |
| Weight | ~60 kg - 80 kg |
| Fixing Points | 2x Vertical Through-Holes |
| Concrete Grade | C40 |
| Reinforcement | 2x 10mm steel bars |
Applications in the UAE
- Multi-Storey Car Parks: Protection of perimeter walls, crash barriers, and pedestrian walkways. Must be installed 0.91 meters (3 feet) from the front of the parking stall (Trakhees Section 15.2.2).
- Commercial Plazas: Demarcation of parking bays in shopping malls and office complexes.
- Industrial Logistics: Heavy-duty stops for forklift charging bays and loading docks.
- Residential Communities: Villa and townhouse driveway definition.
Why Choose PreCastUAE?
- Paint Specification: We use specialized road-marking paints that resist peeling and fading under intense UV exposure.
- Installation Support: We can supply necessary fixing hardware (galvanized bolts or rebar spikes) upon request.
- Stock Levels: Continuous production ensures availability for urgent occupancy certificate (OC) inspections.
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.