Utility

Precast RCC Box Culverts UAE

RCC precast box culverts for UAE stormwater drainage, road crossings, service ducts, and utility tunnels — single, twin, and multi-cell, cast to drawings.

Indicative price AED 480 – 2600 Subject to specification and quantity. Final quote on request.

System RCC Box Culvert / Drainage Channel
Cells Single / Twin / Multi-cell
Span Custom to drawings
Wall Thickness 150mm to 300mm

Product Description

Precast RCC Box Culvert Supplier in UAE

PRECAST UAE manufactures and supplies precast RCC box culverts — reinforced concrete box units for stormwater drainage, road and rail crossings, irrigation channels, service tunnels, and utility duct banks across UAE infrastructure projects.

Box culverts are drawing-led products. The internal span, height, wall thickness, and reinforcement follow the hydraulic flow and load requirement, so the right quotation depends on the section, cover loading, and quantity — not a single catalogue size.

Types of Box Culverts We Supply

  • Single-cell box culverts: standard rectangular RCC units for drainage runs, road crossings, and service ducts.
  • Twin-cell and multi-cell box culverts: higher-flow and wide-span configurations cast to the hydraulic design.
  • Drainage box culverts: stormwater and surface-water conveyance for roadworks and master-planned developments.
  • Service and cable culverts: protected RCC ducts for utility corridors, cable runs, and crossings under live roads.
  • Custom RCC sections: drawing-led culverts with project-specific openings, reinforcement, and lifting details.

Box Culvert Specifications

Box culvert dimensions are confirmed against the drawing, hydraulic calculation, and authority or consultant specification.

Specification Common Value / Description
System Type RCC Box Culvert / Drainage Channel
Cells Single / Twin / Multi-cell
Internal Span Custom to drawings
Internal Height Custom to drawings
Wall Thickness Project-specific, commonly 150 mm to 300 mm
Concrete Grade C40/50 RCC typical
Load Class Pedestrian / road / heavy-duty per design
Handling Integrated lifting anchors
Documentation Shop drawings + QA/QC package

Why Precast Box Culverts

Precast box culverts replace slow in-situ casting. Units are cast and cured in the factory, delivered in sequence, and set on the prepared bedding — so the trench can be backfilled and the road reopened to traffic quickly. The result is consistent geometry, controlled concrete strength, and QA traceability that ad hoc site casting cannot match on a live programme.

Applications Across the UAE

  • Stormwater drainage networks for roadworks and master-planned communities.
  • Road and rail crossings where culverts carry water or services beneath live corridors.
  • Irrigation and landscape channels for parks, farms, and green-spine projects.
  • Service tunnels and cable duct banks protecting utility runs under roads and yards.

We plan box culvert delivery across Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah, and Umm Al Quwain, sequenced around trench readiness and crane access.

If your package also needs access structures, see our Precast Manholes & Utility Chambers UAE page. For protected underground enclosures cast from the same box geometry, see our Precast Bunkers & Concrete Shelters UAE page.

What To Send For Quotation

Send your culvert drawings or section, internal span and height, number of cells, wall thickness, reinforcement notes, load class, quantities, delivery location, and required dates through our contact page. That gives us enough to quote supply and logistics clearly.

Frequently Asked Questions

Do you supply precast box culverts in the UAE?

Yes. PRECAST UAE manufactures and supplies precast RCC box culverts — single-cell, twin-cell, and multi-cell units — for stormwater drainage, road and rail crossings, irrigation channels, service tunnels, and utility duct banks across the UAE.

What box culvert sizes do you produce?

Box culverts are cast to project drawings. Internal span, height, wall thickness, and reinforcement are set by the hydraulic flow and load (HA/HB or project-specific) requirement, then confirmed against the consultant or authority specification.

What is the difference between a box culvert and a precast bunker?

The cast geometry is the same rectangular reinforced box. A box culvert is specified for drainage, crossings, and service ducts; a bunker enclosure uses heavier reinforcement, thicker walls, and sealed openings for protective use. For protected enclosures see our precast bunker page.

What affects box culvert price in the UAE?

Price depends on the cell configuration, span and height, wall thickness, reinforcement, quantity, delivery emirate, and offloading method. Send the drawings and quantities for an accurate supply-and-delivery quote.

What do you need to prepare a box culvert quotation?

Send the culvert drawings or section, internal span and height, number of cells, wall thickness, reinforcement notes, cover/load class, quantities, delivery location, and required dates.

Abu Dhabi Office

MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614

Hours: Mon–Fri 8:00 AM – 5:30 PM

Sharjah Factory

Sharjah Industrial Area, Sharjah

Hours: Mon–Sat 7:00 AM – 6:00 PM

24h Quote
Fast Response
UAE Delivery
Nationwide
Factory Direct
Best Value

Talk to our team

We're here to help with your project

Sales Support: +971 54-171-3700 General Inquiries:

Request a Project Quote

Share your requirements and we'll get back to you within 24 hours.

1 Contact
2 Project
3 Details
Your information is secure and will not be shared.
Success! Your inquiry has been received. Our team will contact you shortly.
Error! Please check your connection and try again.
Call WhatsApp Email