Utility

Street Light Pole Foundation

Type 1 & 2 foundations with pre-installed anchor cages and earthing points.

Indicative price AED 360 – 680 Subject to specification and quantity. Final quote on request.

Type Precast Concrete Base
Pole Height For 6m - 12m Poles
Standard RTA Type 1 / Type 2
Fixing 4-Bolt Cage (M24/M30)

Product Description

Precast Street Light Foundation (Pole Base)

Product Overview

The Precast Street Light Foundation is a “plug-and-play” structural footing designed to expedite the installation of street lighting columns in residential communities and arterial roads. By integrating the anchor bolt cage and cable ducts into a factory-cast block, we eliminate the complex logistics of on-site casting (excavation, shuttering, steel fixing, pouring, and curing).

This solution is particularly effective for large-scale developments where speed of installation and consistency of finish are paramount.

Material Specifications & Quality

  • Concrete: C40/50 Sulfate Resisting Cement (SRC) for subsurface durability.
  • Anchor Bolts: Hot Dip Galvanized (HDG) Grade 8.8 bolts, strictly positioned using CNC-machined templates.
  • Reinforcement: High-yield steel cage designed to resist overturning moments and wind shear.
  • Bitumen Coating: Optional external bitumen painting for enhanced waterproofing below grade.

Key Technical Advantages

  • Construction Speed: Allows for immediate pole erection upon backfilling, reducing critical path timelines by days per pole.
  • Precision Alignment: Factory casting guarantees bolt projection and pattern accuracy, eliminating the risk of misaligned poles.
  • Integrated Services: Pre-installed PVC or HDPE sleeves allow for seamless cable pulling and looping.
  • Type Compatibility: Standard designs available for Type 1 (4-6m) and Type 2 (8-10m) poles, as well as CCTV masts. Designed for RTA Type 1 and Type 2 Conical Poles.

Technical Data

Specification Value
Concrete Grade C40/50 SRC
Bolt Configuration 4-Bolt Pattern (PCD variable)
Bolt Size M16 / M20 / M24 HDG
Ducting 2x or 4x 63mm/110mm PVC Sleeves
Lifting System 2x Lifting Hooks (Recessed or External)
Weight 400kg - 2500kg (Design dependent)

Applications in the UAE

  • Residential Communities: Lighting for internal roads, parks, and walkways in master-planned developments. Standardized for residential community lighting in Deira/Bur Dubai zones.
  • Carparks: Foundations for lighting columns in open-air parking lots.
  • Security Infrastructure: Stable bases for CCTV camera poles and security gates.
  • Signage: Foundations for cantilevered or gantry traffic signs.

Why Choose PreCastUAE?

  • Customization: We fabricate custom steel templates to match any specific pole base plate flange.
  • Technical Compliance: Designs validated against local wind load and soil bearing capacity requirements.
  • Just-in-Time Delivery: Staggered deliveries to match cable laying and pole erection schedules.

Abu Dhabi Office

MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614

Hours: Mon–Fri 8:00 AM – 5:30 PM

Sharjah Factory

Sharjah Industrial Area, Sharjah

Hours: Mon–Sat 7:00 AM – 6:00 PM

24h Quote
Fast Response
UAE Delivery
Nationwide
Factory Direct
Best Value

Talk to our team

We're here to help with your project

Sales Support: +971 54-171-3700 General Inquiries:

Request a Project Quote

Share your requirements and we'll get back to you within 24 hours.

1 Contact
2 Project
3 Details
Your information is secure and will not be shared.
Success! Your inquiry has been received. Our team will contact you shortly.
Error! Please check your connection and try again.
Call WhatsApp Email