Precast HVAC Equipment Slab
Dampening foundations designed for rooftop and ground MEP installations.
Indicative price AED 42 – 95 Subject to specification and quantity. Final quote on request.
Product Description
Precast HVAC Equipment Base
Product Overview
The Precast HVAC Equipment Base is a specialized foundation slab designed to support outdoor mechanical units, including split-system condensers, VRF units, and pool pumps. Elevating equipment off the substrate is a critical requirement for preventing corrosion, ensuring proper condensate drainage, and facilitating maintenance access.
These precast units replace the inconsistent quality of cast-in-situ pads, providing a factory-levelled, structurally sound platform that can be installed immediately prior to equipment placement.
Material Specifications & Quality
- Concrete: C35/45 structural mix with water-reducing admixtures.
- Reinforcement: A142 steel mesh or fiber-reinforcement to resist flexural cracking under point loads.
- Surface: Trowel-finished to a strict tolerance of ±3mm over 1m to ensure unit stability.
Key Technical Advantages
- Vibration Damping: The high mass of the concrete base absorbs low-frequency compressor vibration, reducing noise transmission and mechanical fatigue.
- Corrosion Control: Lifts the unit housing above ground moisture, irrigation spray, and sand accumulation, significantly extending equipment service life.
- Rapid Installation: Eliminates formwork, mixing, and curing time on site. “Drop-and-place” capability accelerates MEP timelines.
- Load Distribution: Spreads the equipment point loads preventing subsidence in soft landscaping or damage to roof membranes.
Technical Data
| Specification | Value |
|---|---|
| Material | Reinforced Concrete |
| Common Dimensions | 600x600, 1000x500, 1200x600 mm |
| Thickness | 50mm / 75mm / 100mm |
| Weight | 40 kg - 150 kg (varies by size) |
| Reinforcement | Steel Mesh / Rebar |
| Design Load | Suitable for standard residential/commercial AC units |
Applications in the UAE
- Residential MEP: Foundations for split AC units in villas and townhouses.
- Rooftop Installations: Spreader plates for package units on bitumen or membrane roofs.
- Utility Support: Bases for water pumps, filtration systems, and small generators.
Why Choose PreCastUAE?
- Dimensional Accuracy: Precise moulds ensure slabs are perfectly square and flat, eliminating rocking units.
- Custom Sizes: Ability to manufacture bespoke dimensions for non-standard equipment footprints or VRF arrays.
- Project Supply: Palletized delivery for streamlined distribution across large residential compound sites.
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.