Heavy-Duty PVC Traffic Cones
Class 2 reflective cones with heavy-duty weighted bases for stability.
Indicative price AED 40 – 85 Subject to specification and quantity. Final quote on request.
Product Description
Heavy-Duty PVC Traffic Cone (750mm/1m)
Product Overview
Heavy-Duty PVC Traffic Cones are the fundamental component of any traffic management system. We supply only professional-grade, one-piece or two-piece interlocking molded PVC cones designed for highway use. Unlike budget polyethylene (PE) cones that shatter on impact, our flexible PVC formulation is engineered to deform and recover, surviving repeated vehicle strikes.
Featuring a heavy, low-center-of-gravity base and high-performance reflective sheeting, these cones ensure compliance with RTA and federal traffic safety standards.
Material Specifications & Quality
- Body Material: 100% Virgin PVC (Fluorescent Orange).
- Base Material: High-density Recycled PVC interlocking base (Black).
- Reflectivity: High Intensity Prismatic (HIP) Class 2 reflective collar (Descaled/Honeycomb pattern).
- UV Stability: Saturated pigmentation prevents the “whitening” effect common in inferior products.
Key Technical Advantages
- Aerodynamic Stability: The weighted base and aerodynamic profile resist toppling caused by the wind shear of passing HGVs (Heavy Goods Vehicles).
- Impact Memory: PVC body collapses harmlessly upon impact and self-corrects to its original shape, minimizing debris on the road.
- High Visibility: Fluorescent pigment combined with wide reflective sleeves ensures day and night visibility from long distances.
- Anti-Jam Stacking: Interior ribs prevent cones from vacuum-locking when stacked, ensuring easy separation during rapid deployment.
Technical Data
| Specification | 750mm Cone | 1000mm Cone |
|---|---|---|
| Height | 750 mm | 1000 mm |
| Weight | 3.2 kg - 4.5 kg | 5.0 kg - 6.5 kg |
| Base Size | 380x380 mm | 490x490 mm |
| Reflective Sleeve | Class 2 Prismatic | Class 2 Prismatic |
| Compliance | BS EN 13422 / RTA | BS EN 13422 / RTA |
Applications in the UAE
- Highway Maintenance: Temporary lane closures on high-speed roads (requires 1m cones).
- Site Ingress/Egress: Warning drivers of construction vehicles entering the carriageway.
- Hazard Demarcation: Immediate isolation of spills, accidents, or road defects.
- Traffic Training: Maneuver markers for driving schools and testing centers.
Why Choose PreCastUAE?
- Safety Compliance: We do not stock “toy” cones. All our inventory is specification-grade suitable for public roads.
- Bulk Availability: Ready stock of 1,000+ units for immediate emergency response or project setup.
- Durability: Tested to perform in temperatures exceeding 50°C without softening to the point of collapse.
Abu Dhabi Office
MAZYAD Offices 2, Mohamed Bin Zayed City, Abu Dhabi 20614
Hours: Mon–Fri 8:00 AM – 5:30 PM
Sharjah Factory
Sharjah Industrial Area, Sharjah
Hours: Mon–Sat 7:00 AM – 6:00 PM
Talk to our team
We're here to help with your project
Request a Project Quote
Share your requirements and we'll get back to you within 24 hours.