Reinforced Concrete Jersey Barrier (3m)
Crash-tested K-Rail barriers with integrated reflectors and interlocking lugs.
Product Description
Reinforced Concrete Jersey Barrier (1m - 3m)
Product Overview
The PrecastUAE Reinforced Concrete Jersey Barrier is the definitive specification for high-speed traffic management, highway diversions, and hostile vehicle mitigation (HVM) in the United Arab Emirates. Engineered with the standard K-Rail profile, this 3-meter unit allows for the safe deflection of errant vehicles by minimizing roll-over risk and redirecting momentum parallel to the roadway.
Designed for rapid deployment and maximum durability, these units serve as the backbone of RTA-compliant road safety schemes and critical site security perimeters across Dubai and Abu Dhabi.
Material Specifications & Quality
Our manufacturing process adheres strictly to BS EN 206 and ASTM C478 standards to ensure structural integrity under impact.
- Concrete Strength: Design mix C40/50 (40 N/mm² Cylinder / 50 N/mm² Cube) at 28 days.
- Cement Type: OPC (Type I) for standard applications; SRC (Type V) available for saline/coastal environments.
- Reinforcement: High-yield deformed steel bars (460 N/mm²) providing tensile strength and crack control.
- Curing: Steam-cured or water-pond cured to achieve 35MPa early strength for safe lifting.
- Finish: F3/F4 off-shutter finish, free from honeycombing and significant voids.
Key Technical Advantages
- Impact Deflection: The dual-slope K-Rail profile lifts the vehicle suspension upon impact, reducing friction and preventing climbing/crossover.
- Interlocking Connectivity: Male/Female interlocking joints ensure a continuous, rigid barrier line that resists lateral displacement during collision.
- Zero-Fixing Stability: At 2,400 kg, the unit’s deadweight provides sufficient inertia to function as a gravity retaining structure or security blockade without ground bolting.
- Lifting System: Integrated lifting eyes or through-holes designed for standard shackles, enabling rapid crane deployment (up to 150m linear run per shift).
Technical Data
| Specification | Value / Description |
|---|---|
| Length (Overall) | 3000 mm |
| Height | 810 mm |
| Base Width | 600 mm |
| Top Width | 200 mm (approx) |
| Weight | 2400 kg (±5%) |
| Concrete Grade | C40/50 |
| Reinforcement | T10 / T12 High Yield Steel Cage |
| Connection Type | Male/Female Interlock |
| Lifting Points | 2x Lifting Eyes / Holes |
Applications in the UAE
- Highway Diversions: RTA-approved temporary lane separators for construction zones on Sheikh Zayed Road and Emirates Road.
- Site Security (HVM): Perimeter hardening for critical infrastructure, embassies, and large-scale events.
- Retaining Walls: Gravity retaining structures for aggregate bays and soil stabilization.
- Edge Protection: Prevention of vehicle run-off at quarry edges and drop-off zones.
Market Context: Why Demand Is Rising
Recent infrastructure announcements are driving high demand for F-Shape and Jersey barriers:
- RTA’s 72 New Projects (2025-2027): 115 bridges and 226km of roads will require extensive temporary traffic management.
- Metro Blue Line: While the metro builds its own tunnels, the surrounding road diversions are consuming market barrier capacity.
- Trade Centre Transformation: Live-traffic construction in Downtown Dubai demands high-specification, RTA-compliant barriers.
Why Choose PreCastUAE?
- Site-to-Site Relocation: We manage the entire lifecycle, including crane-truck logistics to move barriers directly between your active project sites, minimizing downtime.
- Mass Production: High daily casting capacity ensures we can meet demands for 5km+ linear runs on short notice.
- Condition Options: Available as New (Mould Finish) for high-profile areas or Refurbished (Structurally Sound) for cost-effective site hoarding.
Technical Configurations
| Code | Type | Dimensions (LxHxW) | Weight (approx) | Concrete Strength | Reinforcement | Common Applications |
|---|---|---|---|---|---|---|
| JB-3-STD | Standard Jersey | 3.0m x 1.07m x 0.6m | 3,000-3,200 kg | 35 MPa (M35) | 16mm HYSD bars | Highway work zones, temporary diversions |
| JB-3-HD | Heavy Duty Jersey | 3.0m x 1.07m x 0.6m | 3,400-3,600 kg | 40 MPa (M40) | 20mm HYSD bars, Epoxy-coated rebar | High traffic areas, permanent installations |
| JB-4-STD | Standard Jersey (4m) | 4.0m x 1.07m x 0.6m | 4,000-4,200 kg | 35 MPa (M35) | 16mm HYSD bars | Construction sites, long straight sections |
| JB-6-STD | Long Span Jersey | 6.0m x 1.07m x 0.6m | 6,000-6,500 kg | 35 MPa (M35) | 16mm HYSD bars | Airport perimeters, large scale projects |
| JB-2-STD | Short Jersey | 2.0m x 1.07m x 0.6m | 2,000-2,200 kg | 30 MPa (M30) | 12mm HYSD bars | Tight spaces, curved alignments |
| JB-3-PAINT | Painted Jersey | 3.0m x 1.07m x 0.6m | 3,100-3,300 kg | 35 MPa (M35) | 16mm HYSD bars | Event management, high visibility zones |
| Code | Type | Dimensions (LxHxW) | Weight (approx) | Concrete Strength | Reinforcement | Common Applications |
|---|---|---|---|---|---|---|
| KRL-3-STD | K-Rail Standard | 3.0m x 0.81m x 0.48m | 2,400-2,600 kg | 35 MPa (M35) | 16mm HYSD bars | Western standards projects, USA specs |
| KRL-4-STD | K-Rail Long | 4.0m x 0.81m x 0.48m | 3,200-3,400 kg | 35 MPa (M35) | 16mm HYSD bars | Highway median barriers |
| SSL-3-STD | Single Slope | 3.0m x 0.81m x 0.56m | 2,600-2,800 kg | 35 MPa (M35) | 16mm HYSD bars | General traffic control |
| SSL-3-HD | Single Slope HD | 3.0m x 0.81m x 0.56m | 2,800-3,000 kg | 40 MPa (M40) | 20mm HYSD bars | Heavy vehicle areas |
Project Inquiry
Partner with UAE's leading precast supplier. Send us your project specs and get a competitive, transparent quote within 24 hours. Quality you can build on.
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614