Parking

Precast Concrete Wheel Stopper

120mm profile stops designed to safeguard property and organize parking.

Common Name Car Stop / Curb
Standard Lengths 1.8m / 2.0m
Height 100mm / 120mm
Fixing 2x Rebar Spike / Bolt

Product Description

Precast Concrete Wheel Stopper (Car Stop)

Product Overview

The Precast Concrete Wheel Stopper is a critical safety element for parking facility management, designed to physically limit vehicle travel within designated bays. By preventing vehicles from overhanging sidewalks or striking structural columns, walls, and other vehicles, these units mitigate property damage and liability.

Our wheel stops are engineered to withstand the impact of passenger vehicles and light trucks, offering a far superior lifespan compared to rubber or plastic alternatives which warp and detach in high temperatures.

Material Specifications & Quality

  • Concrete Mix: C40/50 High-Performance Concrete.
  • Reinforcement: 2x T10 longitudinal bars with stirrups for impact shear resistance.
  • Finish Options:
    • Standard: Fair-faced grey concrete.
    • Painted: Industrial-grade chlorinated rubber paint (Yellow/Black) for high visibility.

Key Technical Advantages

  • Standardized Dimensions: Sized to fit standard 2.5m x 5.0m parking bays without impeding pedestrian access between vehicles.
  • Optimized Profile: Standard Height: 100mm - 120mm to clear low-profile sports car bumpers while stopping standard sedans/SUVs.
  • Tire Protection: Chamfered top edges eliminate pinch points, preventing damage to low-profile tires.
  • Secure Anchorage: Cast-in holes (Ø20mm) allow for robust fixing to asphalt (via rebar spikes) or concrete slabs (via expansion bolts).
  • Thermal Stability: Concrete matches the thermal expansion coefficient of the parking surface, preventing loosening of fixings common with rubber stoppers.

Technical Data

Specification Value
Length 1800 mm / 2000 mm
Height 100 mm - 120 mm
Base Width 150 mm
Weight ~60 kg - 80 kg
Fixing Points 2x Vertical Through-Holes
Concrete Grade C40
Reinforcement 2x 10mm steel bars

Applications in the UAE

  • Multi-Storey Car Parks: Protection of perimeter walls, crash barriers, and pedestrian walkways. Must be installed 0.91 meters (3 feet) from the front of the parking stall (Trakhees Section 15.2.2).
  • Commercial Plazas: Demarcation of parking bays in shopping malls and office complexes.
  • Industrial Logistics: Heavy-duty stops for forklift charging bays and loading docks.
  • Residential Communities: Villa and townhouse driveway definition.

Why Choose PreCastUAE?

  • Paint Specification: We use specialized road-marking paints that resist peeling and fading under intense UV exposure.
  • Installation Support: We can supply necessary fixing hardware (galvanized bolts or rebar spikes) upon request.
  • Stock Levels: Continuous production ensures availability for urgent occupancy certificate (OC) inspections.

Project Inquiry

Partner with UAE's leading precast supplier. Send us your project specs and get a competitive, transparent quote within 24 hours. Quality you can build on.

Office Location
MAZYAD Offices 2
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614
AL TURAB CONCRETE PRODUCTS MANUFACTURING L.L.C.S.P
Sales Department
Sales Email
General Inquiries

Request a Project Quote

Success! Your inquiry has been received. Our team will contact you shortly.
Error! Please check your connection and try again.
Call WhatsApp Email