Utility
Street Light Pole Foundation
Type 1 & 2 foundations with pre-installed anchor cages and earthing points.
Type
Precast Concrete Base
Pole Height
For 6m - 12m Poles
Standard
RTA Type 1 / Type 2
Fixing
4-Bolt Cage (M24/M30)
Technical Support Available
Delivery across UAE
Product Description
Precast Street Light Foundation (Pole Base)
Product Overview
The Precast Street Light Foundation is a “plug-and-play” structural footing designed to expedite the installation of street lighting columns in residential communities and arterial roads. By integrating the anchor bolt cage and cable ducts into a factory-cast block, we eliminate the complex logistics of on-site casting (excavation, shuttering, steel fixing, pouring, and curing).
This solution is particularly effective for large-scale developments where speed of installation and consistency of finish are paramount.
Material Specifications & Quality
- Concrete: C40/50 Sulfate Resisting Cement (SRC) for subsurface durability.
- Anchor Bolts: Hot Dip Galvanized (HDG) Grade 8.8 bolts, strictly positioned using CNC-machined templates.
- Reinforcement: High-yield steel cage designed to resist overturning moments and wind shear.
- Bitumen Coating: Optional external bitumen painting for enhanced waterproofing below grade.
Key Technical Advantages
- Construction Speed: Allows for immediate pole erection upon backfilling, reducing critical path timelines by days per pole.
- Precision Alignment: Factory casting guarantees bolt projection and pattern accuracy, eliminating the risk of misaligned poles.
- Integrated Services: Pre-installed PVC or HDPE sleeves allow for seamless cable pulling and looping.
- Type Compatibility: Standard designs available for Type 1 (4-6m) and Type 2 (8-10m) poles, as well as CCTV masts. Designed for RTA Type 1 and Type 2 Conical Poles.
Technical Data
| Specification | Value |
|---|---|
| Concrete Grade | C40/50 SRC |
| Bolt Configuration | 4-Bolt Pattern (PCD variable) |
| Bolt Size | M16 / M20 / M24 HDG |
| Ducting | 2x or 4x 63mm/110mm PVC Sleeves |
| Lifting System | 2x Lifting Hooks (Recessed or External) |
| Weight | 400kg - 2500kg (Design dependent) |
Applications in the UAE
- Residential Communities: Lighting for internal roads, parks, and walkways in master-planned developments. Standardized for residential community lighting in Deira/Bur Dubai zones.
- Carparks: Foundations for lighting columns in open-air parking lots.
- Security Infrastructure: Stable bases for CCTV camera poles and security gates.
- Signage: Foundations for cantilevered or gantry traffic signs.
Why Choose PreCastUAE?
- Customization: We fabricate custom steel templates to match any specific pole base plate flange.
- Technical Compliance: Designs validated against local wind load and soil bearing capacity requirements.
- Just-in-Time Delivery: Staggered deliveries to match cable laying and pole erection schedules.
Project Inquiry
Partner with UAE's leading precast supplier. Send us your project specs and get a competitive, transparent quote within 24 hours. Quality you can build on.
Office Location
MAZYAD Offices 2
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614
AL TURAB CONCRETE PRODUCTS MANUFACTURING L.L.C.S.P
Sales Department
Sales Email
General Inquiries