Traffic
Reinforced Concrete Fence Base
Industrial-grade reinforced feet for permanent and temporary mesh fencing.
Common Name
Mesh Fence Footing
Hole Options
Round / Square Post
Weight
25kg - 35kg
Durability
Concrete (Not Plastic)
Technical Support Available
Delivery across UAE
Product Description
Reinforced Concrete Fence Footing
Product Overview
The Reinforced Concrete Fence Footing is the industry-standard support base for temporary “heras-style” mesh fencing panels. Unlike PVC or composite bases that degrade, crack, and leak filler material under the intense UAE sun, our concrete footings provide a permanent, maintenance-free solution.
Designed for harsh construction environments, these bases provide the necessary deadweight to keep fence lines upright and secure without the need for water or sand filling.
Material Specifications & Quality
- Matrix: C35/45 structural concrete.
- Reinforcement: Steel fiber reinforcement or 6mm rebar cage to prevent fracture during rough handling.
- Curing: Water-cured to maximize surface hardness and minimize dusting.
Key Technical Advantages
- Indestructible Durability: Impervious to UV radiation, extreme heat, and site impact. Will not split or leak.
- Zero Maintenance: Delivered ready-to-use. No on-site filling labor required.
- Optimized Geometry: Low center of gravity prevents tipping; compact footprint reduces trip hazards for pedestrians.
- Standard Interface: Precision-cast Ø40mm holes accept all standard temporary fencing frame tubes.
Technical Data
| Specification | Value |
|---|---|
| Material | Reinforced Concrete |
| Weight | 28 kg - 35 kg |
| Dimensions (LxWxH) | Approx. 600mm x 220mm x 150mm |
| Apertures | 2x or 3x Ø40mm holes |
| Lifespan | Indefinite (reusable across multiple projects) |
Applications in the UAE
- Site Demarcation: Securing perimeters for residential and commercial construction plots.
- Pedestrian Walkways: Creating safe, designated corridors within active worksites.
- Excavation Safety: Immediate barrier deployment around open pits and trenches.
- Roadworks: Temporary delineation for utility maintenance crews.
Why Choose PreCastUAE?
- Volume Capacity: Capable of supplying 1,000+ units per order for major infrastructure developments.
- Quality Control: Strict vibration protocols during casting ensure dense, void-free concrete that resists chipping.
- Cost-Efficiency: Although initially heavier to transport than empty plastic bases, the indefinite lifespan and zero-failure rate offer superior lifecycle value.
Technical Configurations
| Code | Type | Dimensions (LxHxW) | Weight (approx) | Hole Size | Concrete Strength | Reinforcement | Common Applications |
|---|---|---|---|---|---|---|---|
| FFB-600 | Fence Footing Block (Standard) | 1000x500x500mm | 600kg | Dia 48mm / 60mm | 40 MPa | Fiber / Rebar | Construction Hoarding |
| FFB-1000 | Fence Footing Block (Heavy) | 1000x500x500mm | 1000kg | Dia 48mm / 60mm | 40 MPa | Fiber / Rebar | High-Wind Areas |
Project Inquiry
Partner with UAE's leading precast supplier. Send us your project specs and get a competitive, transparent quote within 24 hours. Quality you can build on.
Office Location
MAZYAD Offices 2
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614
75, Sultan Bin Mohammed Al Qubaisi St (Street 207)
Mohamed Bin Zayed City, Abu Dhabi 20614
AL TURAB CONCRETE PRODUCTS MANUFACTURING L.L.C.S.P
Sales Department
Sales Email
General Inquiries