The Tender Evaluation Committee has two piles of bids:

  1. The “Standard” Pile: “Mobilization: 30 Days. Construction Start: Day 31.”
  2. The “Winner” Pile: “Mobilization: 7 Days. Construction Start: Day 8.”

How do you get into the second pile without lying? You change your Mobilization Strategy.

The Traditional Bottleneck

Usually, “Mobilization” means:

  • Building a site fence (digging holes, pouring concrete).
  • Building site offices (pouring foundations).
  • Building temporary roads.

This takes 3-4 weeks. The client sees “Month 1” as a dead month.

The “Modular Site Prep” Bid

In your next tender, propose this: “We will utilize Precast Hoarding Foundations and Precast Office Slabs to reduce site establishment time by 70%.”

  • Day 1: Site possession.
  • Day 2: Precast blocks arrive. Fence goes up.
  • Day 3: Precast slabs arrive. Offices land on top.
  • Day 4: Power connected.
  • Day 5: We start digging the main building.

Why Clients Love It

  1. Revenue: If you finish the building 3 weeks early, they get 3 weeks of extra rent.
  2. Professionalism: A precast perimeter looks cleaner and safer than a messy timber hoarding.
  3. Sustainability: They know you will remove and reuse these blocks at the end, boosting their green score.

Win the bid in the first month schedule.