The Urban Surgery Begins

The award of the Dubai Metro Blue Line project is a milestone for public transport, but a headache for the residents of International City, Silicon Oasis, and Mirdif. The route cuts directly through some of the most densely populated residential areas in Dubai.

  • Length: 30km (15.5km underground).
  • Stations: 14.
  • Context: Zero setback from residential towers.

This is “Urban Surgery.” The patient (the city) must remain awake and functioning while you operate.

Acoustic Hoarding is the Solution

In the desert, noise doesn’t matter. In International City, a jackhammer at 2 AM generates police complaints. Too many complaints, and the municipality restricts your working hours. Restricted hours = Schedule delays.

Contractors often treat hoarding as a visual screen. On the Blue Line, it must be an acoustic barrier. Our Solid Hoarding Blocks combined with high-density acoustic panels create a sound shadow. The mass of the concrete base dampens ground vibration, while the height of the hoarding blocks direct line-of-sight noise.

Dust Control is Health Control

Digging cut-and-cover tunnels generates massive dust. In a residential area, coating people’s balconies in silica dust is a health hazard and a PR disaster. Mesh fencing does nothing to stop dust. You need a Sealed Perimeter.

Our precast hoarding systems are designed to fit tight to the ground. We can grout the gap between the block and the pavement, creating a hermetic seal at the base. This prevents dust from blowing out under the fence and keeps the street side clean.

Underneath International City lies a spaghetti bowl of utilities: water, gas, power, fiber optics. You cannot drive stakes into the ground to secure your fencing. You will hit a cable.

Non-Penetrating Foundations are mandatory. Our gravity-based Hoarding Blocks sit on the surface. They provide the necessary overturning moment (wind resistance) without penetrating a single millimeter into the ground. This eliminates the risk of utility strikes during site setup.

The Station Box Logistics

Building an underground station box requires a massive open excavation. The perimeter of this box is a high-risk zone for vehicles and pedestrians. A car rolling into a 20-meter deep station excavation is a catastrophe.

We supply Heavy-Duty F-Type Barriers to ring-fence these deep excavations. These barriers are designed to withstand vehicle impact, preventing accidental incursions into the pit. They serve a dual purpose: Traffic deflection on the street side, and fall protection on the site side.

Urban Challenge Conventional Solution Metro-Grade Solution
Noise Thin Metal Sheets Acoustic Precast Systems
Dust Open Mesh Sealed Base Hoarding
Utilities Driven Posts Surface-Mount Gravity Blocks
Pit Safety Plastic Barriers Concrete Crash Barriers

The “Metro Look”

The Dubai Metro is a premium brand. The construction sites are expected to reflect that quality. RTA inspectors carry a “Snag List” for the site perimeter.

  • Is the hoarding leaning?
  • Is the paint peeling?
  • Are the blocks chipped?

We understand this scrutiny. We supply “Grade A” visual concrete for Metro projects. Our forms are kept pristine to ensure smooth surfaces that take paint well. We deliver a canvas that makes the RTA branding look good.

Silence is Golden (and Profitable)

The faster you work, the more money you make. But you can only work fast (and at night) if the neighbors are sleeping.

Investing in high-quality acoustic perimeter protection isn’t an extra cost; it’s the license to run your 24-hour shift without being shut down by the authorities.

Silence the Site →